Page Header Logo

Cover Page

Journal Content
Browse
  • By Issue
  • By Author
Information
  • For Readers
  • For Authors
  • For Librarians
Current Issue
Atom logo
RSS2 logo
RSS1 logo
  • About the Journal
  • Aims and Scope
  • Submission
  • Author Guidelines
  • Review Process
  • Privacy Statement
  • Article Processing charges
  • Publication Ethics
  • Open Access
  • Copyright and License
  • Archive Policy
  • Plagiarism Policy

Template Cover Page Cover Page
Similarity Checker

Cover Page

Member of

Cover Page

Statistics


Flag Counter

  • Home
  • Current
  • Announcement
  • Archive
  • Editorial Team
  • Reviewers
  • Contact us
  • Search
Home > Articles

Manajemen Waktu Pada Pekerjaan Arsitektur Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani

  • Windi
    Universitas Pelita Bangsa

  • Ahmad Aguswin
    Universitas Pelita Bangsa

  • Akhmad Akromusyuhada
    Universitas Pelita Bangsa


DOI: https://doi.org/10.37034/infeb.v6i1.801
Keywords: Projects, Supervision, S-Curve, Time Management, Work Quality

Abstract

The success or failure of a project can be influenced by the lack of planning of project activities, and the supervision carried out is ineffective and has an impact on the project running inefficiently. Then, it will result in delays and a decrease in the quality of work and have an impact on swelling the project budget. Project management is needed in order to manage projects starting from implementation to the end of a project. This research uses a case study on the Pelita Ilmu Foundation Building Construction Project, especially architectural work. This building is located on Jl. Rawa Kuda, Kp. Rawa Kuda RT/RW 004/002 Karangharum, Kedungwaringin District, Bekasi Regency, West Java 17540 [1]. The S curve is used to find out how long a project takes to complete. The aim of this research is to determine time efficiency in terms of the S Curve graph. The results of time management analysis using the S Curve on the graph showed that the realization of time delays was not in accordance with the plan.

Downloads

Download data is not yet available.

References

Wang, Z., & Liu, J. (2020). A Seven-Dimensional Building Information Model for the Improvement of Construction Efficiency. Advances in Civil Engineering, 2020. DOI: https://doi.org/10.1155/2020/8842475 .

Tobarra, L., Utrilla, A., Robles-Gómez, A., Pastor-Vargas, R., & Hernández, R. (2021). A Cloud Game-Based Educative Platform Architecture: The Cyberscratch Project. Applied Sciences (Switzerland), 11(2), 1–22. DOI: https://doi.org/10.3390/app11020807 .

Nunes, M., Abreu, A., & Saraiva, C. (2021). A Model to Manage Cooperative Projects Risks to Create Knowledge And Drive Sustainable Business. Sustainability (Switzerland), 13(11). DOI: https://doi.org/10.3390/su13115798 .

Herrera, R. F., Rivera, F. C. M. L., Vargas, C. F., & Antio, M. M. (2017). Uso e Impacto de los Modelos nD como Herramienta para la Dirección de Proyectos en la Industria de la Arquitectura, Ingeniería y Construcción. Informacion Tecnologica, 28(4), 169–178. DOI: https://doi.org/10.4067/S0718-07642017000400019 .

Sun, Y., Li, Y., Tian, Y., & Qi, W. (2022). Construction of a Hybrid Teaching Model System Based on Promoting Deep Learning. Computational Intelligence and Neuroscience, 2022. DOI: https://doi.org/10.1155/2022/4447530 .

Fuentes-Pérez, J. F., & Sanz-Ronda, F. J. (2021). A Custom Sensor Network for Autonomous Water Quality Assessment In Fish Farms. Electronics (Switzerland), 10(18). DOI: https://doi.org/10.3390/electronics10182192 .

Costa, L., Barbosa, M. B. A., Baldam, R. de L., & Coelho, T. de P. (2019). Challenges of Process Modeling in Architecture and Engineering to Execute Projects and Public Works. Journal of Construction Engineering and Management, 145(1). DOI: https://doi.org/10.1061/(asce)co.1943-7862.0001575 .

Gagliardi, G., Lupia, M., Cario, G., Tedesco, F., Gaccio, F. C., Lo Scudo, F., & Casavola, A. (2020). Advanced Adaptive Street Lighting Systems for Smart Cities. Smart Cities, 3(4), 1495–1512. DOI: https://doi.org/10.3390/smartcities3040071 .

Bonilla, L. L. L., Guzmán, M. F. S., & Ruíz, D. D. P. (2020). Importancia De La Planeación En La Gestión De Vivienda Social: Caso Buenaventura (Colombia). Revista Lasallista de Investigacion, 17(2), 236–255. DOI: https://doi.org/10.22507/rli.v17n2a17 .

Bensalah, M., Elouadi, A., & Mharzi, H. (2019). Overview: The Opportunity of BIM In Railway. Smart and Sustainable Built Environment, 8(2), 103–116. DOI: https://doi.org/10.1108/SASBE-11-2017-0060 .

Browning, T. R. (2014). Managing Complex Project Process Models with A Process Architecture Framework. International Journal of Project Management, 32(2), 229–241. DOI: https://doi.org/10.1016/j.ijproman.2013.05.008 .

Maliha, M. N., Abu Aisheh, Y. I., Tayeh, B. A., & Almalki, A. (2021, March 2). Safety Barriers Identification, Classification, and Ways To Improve Safety Performance In The Architecture, Engineering, And Construction (Aec) Industry: Review Study. Sustainability (Switzerland). MDPI AG. DOI: https://doi.org/10.3390/su13063316 .

Allahaim, F. S., & Liu, L. (2015). Causes of Cost Overruns on Infrastructure Projects In Saudi Arabia. International Journal of Collaborative Enterprise, 5(1/2), 32. DOI: https://doi.org/10.1504/ijcent.2015.073176 .

Chou, J. S., Chen, H. M., Hou, C. C., & Lin, C. W. (2010). Visualized EVM System for Assessing Project Performance. Automation in Construction, 19(5), 596–607. DOI: https://doi.org/10.1016/j.autcon.2010.02.006 .

Lin, Y. C., Lo, N. H., Hu, H. T., & Hsu, Y. T. (2020). Collaboration-Based BIM Model Development Management System for General Contractors in Infrastructure Projects. Journal of Advanced Transportation, 2020. DOI: https://doi.org/10.1155/2020/8834389 .

Chen, Q., Adey, B. T., Haas, C. T., & Hall, D. M. (2022). Exploiting Digitalization for The Coordination of Required Changes to Improve Engineer-To-Order Materials Flow Management. Construction Innovation, 22(1), 76–100. DOI: https://doi.org/10.1108/CI-03-2020-0039 .

Wang, Z., & Rezazadeh Azar, E. (2019). BIM-Based Draft Schedule Generation In Reinforced Concrete-Framed Buildings. Construction Innovation, 19(2), 280–294. DOI: https://doi.org/10.1108/CI-11-2018-0094 .

Ferrati, M., Settimi, A., Muratore, L., Cardellino, A., Rocchi, A., Hoffman, E. M., … Pallottino, L. (2016). The Walk-Man Robot Software Architecture. Frontiers in Robotics and AI, 3(MAY). DOI: https://doi.org/10.3389/frobt.2016.00025 .

El Khatib, M. M., Al Hashimi, S., & Al Ketbi, M. (2023). Impact of Remote Work on Project Management Cases from UAE Construction Sector. Journal of Service Science and Management, 16(01), 30–43. DOI: https://doi.org/10.4236/jssm.2023.161003 .

Dhopte, S., & Daga, A. (2022). Exploring The Journey Of BIM In The Indian AECO Industry (2008–2022) An Excelize Perspective. CSI Transactions on ICT, 10(2), 159–174. DOI: https://doi.org/10.1007/s40012-022-00364-9 .

Download
Published
2024-01-31
Issue
Vol. 6, No. 1 (March 2024)
Section
Articles
How to Cite
Windi, Aguswin, A., & Akromusyuhada, A. (2024). Manajemen Waktu Pada Pekerjaan Arsitektur Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani. Jurnal Informatika Ekonomi Bisnis, 6(1), 75-79. https://doi.org/10.37034/infeb.v6i1.801
  • ACM
  • ACS
  • APA
  • ABNT
  • Chicago
  • Harvard
  • IEEE
  • MLA
  • Turabian
  • Vancouver
Download Citation
  • Endnote/Zotero/Mendeley (RIS)
  • BibTeX
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.



Indexing and Abstractions:

Published:

       Creative Commons License
       This work is licensed under a Creative Commons Attribution 4.0 International Public License (CC BY 4.0).