Manajemen Waktu Pada Pekerjaan Mechanical Electrical Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani
Keywords:
Projects, Supervision, S-Curve, Time Management, Mechanical Electrical
AbstractThe success or failure of a project can be influenced by the lack of planning of project activities, and the supervision carried out is ineffective and has an impact on the project running inefficiently. Then, it will result in delays and a decrease in the quality of work and have an impact on swelling the project budget. Project management is needed in order to manage projects starting from implementation to the end of a project. This research uses a case study on the Pelita Ilmu Insani Foundation Building Construction Project, especially on Mechanical Electrical work. This building is located on Jl. Rawa Kuda, Kp. Rawa Kuda RT/RW 004/002 Karangharum, Kedungwaringin District, Bekasi Regency, West Java 17540. The S curve is used to find out how long a project takes to complete and shows the progress of the project from the start of construction work to its completion. The aim of this research is to determine time efficiency in terms of the S Curve graph. The results of the time management analysis using the S Curve on the graph showed that the realization of time delays was not in accordance with the plan.Downloads
Download data is not yet available.
ReferencesChao, L. C., & Chen, H. T. (2015). Predicting Project Progress Via Estimation of S-Curve’s Key Geometric Feature Values. Automation in Construction, 57, 33–41. DOI: https://doi.org/10.1016/j.autcon.2015.04.015 . Windi, Aguswin, A., & Akromusyuhada, A. (2024). Manajemen Waktu Pada Pekerjaan Arsitektur Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani. Jurnal Informatika Ekonomi Bisnis, 75–79. DOI: https://doi.org/10.37034/infeb.v6i1.801 . Konior, J., & Szóstak, M. (2020). The S-Curve as A Tool for Planning and Controlling of Construction Process-Case Study. Applied Sciences (Switzerland), 10(6). DOI: https://doi.org/10.3390/app10062071 . Konior, J., & Szóstak, M. (2020). Methodology of Planning The Course of The Cumulative Cost Curve in Construction Projects. Sustainability (Switzerland), 12(6). DOI: https://doi.org/10.3390/su12062347 . Cristóbal, J. R. S. (2017). The S-Curve Envelope as a Tool for Monitoring and Control of Projects. In Procedia Computer Science (Vol. 121, pp. 756–761). Elsevier B.V. DOI: https://doi.org/10.1016/j.procs.2017.11.097 . Türkakın, O. H., Manisalı, E., & Arditi, D. (2020). Delay Analysis in Construction Projects with No Updated Work Schedules. Engineering, Construction and Architectural Management, 27(10), 2893–2909. DOI: https://doi.org/10.1108/ECAM-09-2019-0470 . Ramadhan, P. M., & Anwar, S. (2022). Analisis Manajemen Konstruksi Pada Jembatan Cikeusal. Jurnal Konstruksi Dan Infrastruktur, 10(1). DOI: https://doi.org/10.33603/jki.v10i1.6586 . Astari, N. M., Subagyo, A. M., & Kusnadi, K. (2022). Perencanaan Manajemen Proyek Dengan Metode Cpm (Critical Path Method) dan Pert (Program Evaluation And Review Technique). Konstruksia, 13(1), 164. DOI: https://doi.org/10.24853/jk.13.1.164-180 . Pagehgiri, J., Putra, I. K. A. A., & Sriasa, I. K. (2022). Analisa Cash Flow Kontraktor Berdasarkan Time Schedule Pada Proyek Pembangunan Gedung Lantai Iii (6 Rkb, Tangga) Sdn 2 Panjer, Denpasar. Jurnal Teknik Gradien, 14(02), 49–61. DOI: https://doi.org/10.47329/teknikgradien.v14i02.939 . Hidayah, R., Ridwan, A., & Cahyo, Y. (2018). Analisa Perbandingan Manajemen Waktu Antara Perencanaan Dan Pelaksanaan (Studi Kasus: Pada Gedung Asrama Pondok Pesantren Sananul Huda Di Selorejo Kab. Blitar). Jurnal Manajemen Teknologi & Teknik Sipil, 1(2). DOI: https://doi.org/10.30737/jurmateks.v1i2.416 . Kaka, A. P. (1999, March 1). The Development of A Benchmark Model That Uses Historical Data for Monitoring The Progress of Current Construction Projects. Engineering, Construction and Architectural Management. DOI: https://doi.org/10.1108/eb021116 . Kenley, R., & Wilson, O. D. (1986). A Construction Project Cash Flow Model - An Idiographic Approach. Construction Management and Economics, 4(3), 213–232. DOI: https://doi.org/10.1080/01446198600000017 . Maddeppungeng, A., & Suryani, I. (2015). Analisis Pengendalian Penjadwalan Pembangunan Gedung Administrasi Universitas Pendidikan Indonesia (Upi) Kampus Serang Menggunakan Metode Work Breakdown Structure (Wbs) dan Kurva-S. Fondasi : Jurnal Teknik Sipil, 4(1). DOI: https://doi.org/10.36055/jft.v4i1.1230 . Sulistia, D., & Agustina, I. D. (2023). Penjadwalan Proyek Dengan Kurva-S Pada Pembangunan Perumahan di Kota Bekasi. Jurnal Al Ulum LPPM Universitas Al Washliyah Medan, 11(2), 100–106. DOI: https://doi.org/10.47662/alulum.v11i2.540 . Papua, M., Dewita, H., & Sembiring, K. (2023). Analisis Penjadwalan dengan Menggunakan Time Schedule Kurva S Pada Proyek Pembangunan Kantor Cabang Bri Otista Jakarta Timur. Jurnal Teknika, 15(1), 9–22. DOI: https://doi.org/10.30736/jt.v15i1.916 . Puspitasari, D. P., Purwono, N. A. S., & Poerwodihardjo, F. E. (2022). Analisis Perbandingan Penjadwalan Proyek Dengan Metode Cpm, Pert, Kurva-S (Studi Kasus Peningkatan Jalan Menganti Kesugihan). Teodolita: Media Komunkasi Ilmiah Di Bidang Teknik, 23(1), 77–89. DOI: https://doi.org/10.53810/jt.v23i1.441 . Arianie, G. P., & Puspitasari, N. B. (2017). Perencanaan Manajemen Proyek dalam Meningkatkan Efisiensi Dan Efektifitas Sumber Daya Perusahaan (Studi Kasus : Qiscus Pte Ltd). J@ti Undip : Jurnal Teknik Industri, 12(3), 189. DOI: https://doi.org/10.14710/jati.12.3.189-196 . Mindra Putra, W., & Hayadi Umar, U. (2021). Estimasi Waktu Untuk Pengadaan Material Berdasarkan Time Schedule Pada Proyek Pembangunan Ruko Kawasan SP Plaza Batu Aji. Journal of Civil Engineering and Planning, 2(1). DOI: https://doi.org/10.37253/jcep.v2i1.726 . Hsu, H. C., Chang, S., Chen, C. C., & Wu, I. C. (2020). Knowledge-Based System for Resolving Design Clashes in Building Information Models. Automation in Construction, 110. DOI : https://doi.org/10.1016/j.autcon.2019.103001 . Khasbage, Y. R. (2022). Study On Building Information Modeling and Implementation of Clash Detection Tool In Building Design. Interantional Journal of Scientific Research In Engineering And Management, 06(06). DOI: https://doi.org/10.55041/ijsrem14580 . Lee, D., Kim, D. S., Kim, G. H., & Kim, S. (2016). Time Reduction Effect of The Enhanced TACT Method for High-Rise Residential Buildings. Journal of Civil Engineering and Management, 22(7), 944–953. DOI: https://doi.org/10.3846/13923730.2014.945949 . Tanga, O., Akinradewo, O., Aigbavboa, C., & Thwala, D. (2022). Cyber Attack Risks To Construction Data Management In The Fourth Industrial Revolution Era: A Case Of Gauteng Province, South Africa. Journal of Information Technology in Construction, 27, 845–863. DOI: https://doi.org/10.36680/j.itcon.2022.041 . Wang, Y., Thangasamy, V. K., Hou, Z., Tiong, R. L. K., & Zhang, L. (2020). Collaborative Relationship Discovery in BIM Project Delivery: A Social Network Analysis Approach. Automation in Construction, 114. DOI: https://doi.org/10.1016/j.autcon.2020.103147 . |
Published
2024-08-30
Section
Articles
How to Cite
Aguswin, A., Windi, & Akromusyuhada, A. (2024). Manajemen Waktu Pada Pekerjaan Mechanical Electrical Proyek Pembangunan Gedung Yayasan Pelita Ilmu Insani. Jurnal Informatika Ekonomi Bisnis, 6(3), 618-622. https://doi.org/10.37034/infeb.v6i3.960
This work is licensed under a Creative Commons Attribution 4.0 International License. |